EL SEWEDY CABLES QATAR (Doha Cables Projects Division), founded in 2009, is the pioneer of underground cabling works in the state of Qatar. In the last 14 years, the company has routed, designed, or installed more than 2,000 kilometers of underground transmission lines on behalf of more than 40 local and international clients. The company specializes in Engineering, Procurement, Construction, Testing & Commissioning of Underground HV & EHV Cable Projects up to 400KV.

Our key areas of expertise include, but are not limited to, complete EPC underground cable projects, High Voltage Testing, Underground EHV & HV cable fault locating & rectification works, Cable Spiking, Sand Blasting Works, Link Box Modification Works, Cable Route Design, Cable Route Diversion of Existing Circuits, Fiber Optic Cable Works related to EPC, On-Site HVAC Testing System complying with IEC 60840 and IEC 62067, etc.,

As of 2023, we have successfully installed and energized the below numbers of cables and circuits, respectively.

  • 3603.6  Kilometers of cables laid (incl. 220 kV, 132 kV, 66 kV, MV, and LV Cables)
  • 269 Feeders of cable routes are energized (incl. 220 kV, 132 kV, 66 kV, & 33 kV)

Furthermore, the Projects Division has secured contracts totaling more than USD 700 million to date.

EPC Projects Division has obtained ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018 certifications as a leading Turnkey contractor for Design, Engineering, Manufacturing, Supply, Installation & Commissioning of Power Cables up to 220kV in power transmission and distribution networks.

 

EL SEWEDY CABLES QATAR (Doha Cables Projects Division) successfully executed the below notable projects:

  • Lusail Development Project (CP1) underground cable management system.
  • Lusail Development Project (CP4) Southern Interchange Cabling work ON-TIME completed project.
  • 132kV, Cable installation in Micro Tunnel – Lusail Expressway Project.
  • 132kV Cable Routes inside Amiri Guard under Kahramaa Phase 10 Project.
  • 132kV Cable Routes inside Mesaieed Industrial City & Ras Laffan Industrial City – Interface with stakeholders Qatar Energy, Qatar Steel, QAPCO, QSTec etc.,
  • 132kV Cable Route in North Field East Expansion Project (Ras Laffan Industrial City).
  • Underground Cable routes establishment for State of Art Qatar megaprojects like QRAIL, FIFA Stadiums, Lusail City, Hamad Port etc.,
  • Cable Diversion Work – Construction of West Bay North Development – Parks & Roads (Doha Corniche).

SUBSTATION RELATED PROJECTS

  • Al Wukair 11 substation project with Ezdan Real Estate.
  • 33kV Switchgear modification project inside Mesaieed Industrial City with QAFAC.
  • NFE Lot W2/W3 SS-6500 project inside Ras Laffan Industrial City with CTJV / Qatargas.